Multi-Plot Developments
Windows and doors for multi-plot sites across Essex, priced by house type, made in batches, delivered in phases and protected until the site is ready for them.
Rated Excellent on TrustpilotOur Approach
Volume work rewards organisation, and that is the part we put the most into. Each plot type is priced once and repeated, every opening is surveyed before its frames are made, orders are batched through the factory, and deliveries are phased so each set arrives when the openings exist and there is somewhere dry to put them.
The result is the fortieth plot matching the first, frames going in the condition they left the factory, and a handover with a short snag list.

How Volume Works Here
The advantage of forty plots is repetition. It only helps if the repetition is organised.
01
Send the plot schedule and the drawings and we price each house type once, then multiply. Change a plot type later and only that line changes.
02
Plots of the same type are made together, which is how the fifteenth front door matches the first one. It also takes cost out compared with fifteen separate orders.
03
Production and delivery timed to the build. A site does not want a whole development’s glazing arriving in week one and sitting in a container for four months.
04
Factory-finished joinery is at its best when it goes straight from the van to the opening. We issue written site care guidance, and where space is short we hold stock and deliver when each plot is ready.
05
The same surveyors on plot one and plot forty, so a detail that was resolved on the first house does not get re-resolved differently on the last.
06
Warranty terms, care instructions and a named service coordinator, ready for the buyer’s file. The warranty transfers with the property, so it keeps working after completion.
The Range
Few sites want one specification throughout. Timber or wood-effect uPVC sashes where the plots are traditional, aluminium on the contemporary units, and a composite entrance door range that covers the whole development. One supplier, one survey team, one invoice trail.

Repeat Types
Consistency is the thing buyers notice. A plot ordered in March and a plot ordered in October come out of the same specification, in the same white, with the same glass and ironmongery.
Batching plots of the same type through the factory together is how that is held, and it is also where the cost saving on volume comes from.

Entrance Doors
Entrance doors are the one element a buyer stands in front of before they see anything else. Distinction composite doors give you a single range that covers traditional and contemporary plots, Secured by Design accredited, in a colour per house type if you want one.
Timber and aluminium entrance doors are available across the same site where particular plots warrant them.
How It Runs
Step 1
Drawings and a schedule in, priced by house type, with anything that will not work as drawn flagged before it is repeated forty times.
Step 2
One specification per plot type, with the variations written down, the affordable units, the show home, the plots facing the road.
Step 3
Every plot surveyed before its batch goes into production. Manufacturing sizes come from the opening, not the drawing.
Step 4
Delivered against your programme, installed by our teams or yours, with a handover pack for each plot.
On new-build plots we install into openings your team has formed. They need to be structurally complete, square, plumb, level and within normal construction tolerances, with clear access and any scaffolding certified.
Pricing assumes one continuous visit per plot. Where a second visit is needed because a plot is not ready, that is charged at £750 + VAT per day, which is in the scope document before you order. On a phased site, moving a plot down the order costs nothing if we know in time.
On Site
Powder coating and factory paint finishes arrive on site ready for handover, and with a little care between delivery and completion they hand over exactly as they arrived. Our site care guidance sets out what helps.

The Commitments
Lead times run from sign-off of drawings, not from order. Warranty terms are set out in full in the warranty document below.
| Priced by | Plot type | One price per house type, multiplied across the schedule |
| Survey | Every plot | Before its batch goes into production |
| Lead time, timber | 10–14 weeks | From sign-off; batches phased after that |
| Lead time, PVC & aluminium | 4–6 weeks | From sign-off of drawings |
| Delivery | Phased | To your programme, with storage where space is short |
| Installation warranty | 10 years | Where our own teams install; not supply-only |
| Warranty on resale | Transfers | Passes to the buyer with the property |
| Prepared openings | One continuous visit | Per plot. Additional or abortive visit £750 + VAT per day |
| Pricing | Trade and volume | Available on multi-plot work, ask and we will talk it through |
Documents
Issued with every quotation, so your QS, your site manager and your sales office are all reading the same thing.
PDF · Prepared openings
Site requirements, tolerances, programme and visit charges.
PDF · On site
Storing, protecting and cleaning factory finishes on a live site.
PDF · Warranty
Periods by component, exclusions, claims, and transfer on resale.
Also worth reading
The developers page covers the commercial side of the same work, what we take on, how supply-only compares with supply and fit, and what your buyer gets after completion.